Request of Freelance Inspector (Mech or Elect) in Europe/Malaysia

OMIC-IDEAS Consortium is providing TPI Services for Indonesia Power and Oil&Gas Projects, One of Project is Indonesia Nation Power Plant and Grid Development Project, The Owner is PLN (Persero).

Most of Inspections are FAT Witness including LA/CVT in Ludvika/Sweden, Turbine Generator in Erfurt/Germany and Vasteras/Sweden, Insulator in Nusco/Italy, Steam Turbine Unit in Plzen/Czech, Compressor in Dijon/France, Deaerator in Hengelo/Netherlands.

Work Scope: FAT Witness on behalf of Owner (PLN), The Inspector will submit the ISR, MoM and Vendor Documents Review(Signature).

Currently We are needing some Inspector as the following: 

Project Name: Material Transmisi Utama Tahun 2018

Contractor: PT. ABB Sakti Industri

Owner: PLN (Persero)

Inspector represent: PLN (Persero) - Pusmanpro

Inspection Date: 10-11 Jun. 2020

Inspection Site: ABB HV Beijing, China

No. 12 Jingyuan Street, Beijing Economic Technoligical Development Area, 

Beijing 100176, PR China.

Subject of Inspection:  Circuit Breaker 150 kV, type CB 150

-----------------

Project name: Material Transmisi Utama Terpisat 2018 - Paket B
Contractor: PT UNILEC Indonesia (Unindo)
Owner: PT PLN (Persero) - UIT TJBTB
Our inspector represent: PT PLN (Persero) - Pusmanpro
Inspection date: 20-23 April 2020
Subject of Inspection: Circuit Breaker 150 kVCB 500kV
Inspection site: GE High Voltage Switchgear (Suzhou) Co., Ltd.苏州
 
No. 88 Lushan Road, Suzhou, 215129, China

-------------------------

Project name: Pekerjan Pembangunan GI 150kV Cendana dan SUTT 150kV Cendana Shingle Phi (Parit Baru-Kotabaru)

Contractor: PT Intan Mufakat Raya

Vendor: Siemens AG

Owner: PT PLN (Persero) - UIP KALBAGBAR

Our inspector represent: PT PLN (Persero) - Pusmanpro

Inspection site: Siemens AG, Nonnendammallee 104, 13629 Berlin, Germany

Inspection date: Tuesday 31 Mar 2020, 09:00 AM

Inspection: (1) FAT witness (2) to review and report the MDR(Manufacture Data Record) 

Contact Person: Mr. Tino Gassmann, Phone: +49 174 2485118

 

Project name: Lombok CFSPP FTP-2 (2x50 Mw) - Zarei (Paid)

Contractor: Consortium of PT Rekayasa Industri and Rafako S.A.

Owner: PT PLN (Persero) - UIP Nusatenggara
Equipment: Insulated Phase Busduct (IPB) FAT

Inspection site: Tefelen Preissinger GmbH

Industriestraße 12, 96120 Bischberg, Germany

Inspection date: 23-24 March 2020

------------------------------------------------------------------------------------------------

Project Name: Material Transmisi Utama Tahun 2018

Contractor: PT. ABB Sakti Industri

Owner: PLN (Persero) - UIP Sumbagut

Inspector represent: PLN (Persero) - Pusmanpro

Inspection Date: 14 Apr. 2020

Inspection Site: ABB Ludvika, Sweden 

Subject of Inspection:  Capacitor Voltage Transformer 275 kV, type CVT 275

 --------------------------

Project Name: Material Transmisi Utama Tahun 2018 - UIP Sumbagsel (Postponed)

Contractor: PT. ABB Sakti Industri

Owner: PLN (Persero) - UIP Sumbagsel

Inspector represent: PLN (Persero) - Pusmanpro

Inspection Date: 19 and 26 Mar. 2020

Inspection Site: ABB Ludvika, Sweden

Subject of Inspection:  Capacitor Voltage Transformer 275 kV

Inspection:

1. FAT witness inspection of Capacitor Voltage Transformer 

2. Review and report the provided Manufacture Data Record (MDR) in regards to the work items on the Shop ITP

---------------------------------------------------------------------------------------

Project Name: Material Transmisi Utama Tahun 2018 (Waived)

Contractor: PT. ABB Sakti Industri

Owner: PLN (Persero) - UIP Sumbagut

Inspector represent: PLN (Persero) - Pusmanpro

Inspection Date: 26 Mar. 2020

Inspection Site: ABB Ludvika, Sweden

Subject of Inspection:  Lightning Arrester 275 kV, type LA275

-------------------------

Project Name: Material Transmisi Utama Tahun 2018 (Waived)

Contractor: PT. ABB Sakti Industri

Owner: PLN (Persero) - UIP Sumbagut

Inspector represent: PLN (Persero) - Pusmanpro

Inspection Date: 25 Mar. 2020

Inspection Site: ABB Ludvika, Sweden

Subject of Inspection:  Lightning Arrester 150 kV, type LA150 and 275 kV, type LA275
-----------------

Project Name: Material Transmisi Utama Tahun 2018 (Paid)

Contractor: PT. ABB Sakti Industri

Owner: PLN (Persero) - UIP Sulbagsel

Inspector represent: PLN (Persero) - Pusmanpro

Inspection Date: 11 Mar. 2020

Inspection Site: ABB Ludvika 

Subject of Inspection:  Lightning Arrester 150 kV, type LA 150

 ---------------------

Project Name: Material Transmisi Utama Tahun 2018 - GITET Krian IBT 5, Peruntukan UIT JBTB

Contractor: PT. ABB Sakti Industri

Owner: PLN (Persero) - UIT JBTB

Inspector represent: PLN (Persero) - Pusmanpro

Subject of Inspection:  Lightning Arrester 500 kV, type LA 500

Inspection Date: 21 Feb. 2020

Inspection Site: ABB Ludvika, Sweden

 

Project name[ISR-031]: Pengadaan Material Utama 2018

Owner: PT. PLN (Persero) - UIP Maluku

Inspector represent: PT. PLN (Persero) - Pusmanpro

Subject of Inspection: LA 70kV - RFQ 001 and LA 150kV - RFQ002

Date of inspection: February 11, 2020

Location of inspection: ABB Ludvika, Sweden

 

Project Name: Pembangunan GITET 500kV Perawang
Owner: PT PLN (Persero), UIP Sumbagteng
Inspector represent: PT PLN (Persero) Pusmanpro
Contractor/Vendor: PT. Indokomas Buana Perkasa
Insection Material: Disconnecting Switch (DS)
Manufacture: GE Grid Solution SpA
Inspection Site: Unit CME, Via Meucci, 22 - 30020 - Noventa di Piave, Venice, Italy
Schedule: 12-14 Feb 2020

==========================

Project Name: Material Transmisi Utama Tahun 2018

Contractor: PT. ABB Sakti Industri

Owner: PLN (Persero) - UIP Sulbagsel

Inspector represent: PLN (Persero) - Pusmanpro

Subject of Inspection:  Circuit Breaker 150 kV, type CB 150

Inspection Date: 14 Feb. 2020

Inspection Site: ABB HV Beijing, China [No. 12 Jingyuan Street, Beijing Economic Technological Development Area, Beijing 100176, PR China.]北京市通州区经济技术开发区景园街12号

Project Name: Pembangunan GITET 500kV Perawang
Owner: PT PLN (Persero), UIP Sumbagteng
Inspector represent: PT PLN (Persero) Pusmanpro
Contractor/Vendor: PT. Indokomas Buana Perkasa
Insection Material: Sealing End (SE)
Manufacture: Sudkabel
Inspection Site: Sudkabel GmbH. Rhenaniastraße 12, 68199 Mannheim, Germany
Schedule: 19 Feb 2020

Project Name: Pembangunan GITET 500kV Perawang
Owner: PT PLN (Persero), UIP Sumbagteng
Inspector represent: PT PLN (Persero) Pusmanpro
Contractor/Vendor: PT. Indokomas Buana Perkasa
Insection Material: Line Trap (LT)
Manufacture: Trench
Inspection Site: Trench Austria GmbH, Paschinger Strase 49 Leonding, AT-4060 Austria
Schedule: 17 Feb 2020

 Project Name: Pembangunan Gardu Induk Tegangan Ekstra Tinggi 500 kV Perawang
Subject: Shunt Reactor 500kV
Contractor: PT. Indokomas Buana Perkasa (OMEXCOM)
Factory: General Electric, Wuhan - China
Inspector represent: PT. PLN (Persero) – Pusmanpro
Inspection Site: General Electric, Wuhan - China
Inspection Date: 20-22 January 2020
------------------------------------------------

 Project Name: Pengadaan Material Transmisi Utama 2018, GI 150kV PLTU Bau-bau
Vendor: PT. ABB Sakti Industri
Owner: PT PLN (Persero) - UIP Sulbagsel
Our inspector represent: PT PLN (Persero) - Pusmanpro
Subject of Inspection: 150kV Lightning Arrestor
Inspection site: ABB High Voltage Product, Valhallgen 2, Ludvika, Sweden
Inspection type: FAT
Schedule: Wednesday, January 23, 2020

 Project Name: Pengadaan Material Transmisi Utama 2018, GI 150kV Pematang Siantar
Vendor: PT. ABB Sakti Industri
Owner: PT PLN (Persero) - UIP Sulbagsel
Our inspector represent: PT PLN (Persero) - Pusmanpro
Subject of Inspection: 150kV Lightning Arrestor
Inspection site: ABB High Voltage Product, Valhallgen 2, Ludvika, Sweden
Inspection type: FAT
Schedule: Wednesday, January 22, 2020

 Project Name: Pekerjaan Pembangunan Gardu Induk 150 kV PLTU Barru-2 (Ext)
Contractor: PT. Wijaya Karya (Persero) Tbk.
Owner: PT PLN (Persero) - UIP Sulbagsel
Our inspector represent: PT PLN (Persero) - Pusmanpro
Subject of Inspection: 150kV outdoor CVT(Capacitor Voltage Transformer)
Inspection site: ABB Power Transformer Product, Valhallgen 2, Ludvika, Sweden
Inspection type: FAT
Schedule: Wednesday, January 22, 2020

 Project name: Pengadaan Material Transmisi Utama 2018
Owner: PT. PLN (Persero) - UIP Maluku
Inspector represent: PT. PLN (Persero) – Pusmanpro
Subject of Inspection: LA 70kV – RFQ 001, Lightning Arrestor
Date of inspection: January 28, 2020
Location of inspection: ABB Ludvika, Sweden
-----------------------------
 FAT of Boiler Feedwater Pump - Motor Performance Test - Electrical
Project name: Lombok CFSPP FTP-2 (2x50 MW) Power Plant
Contractor: Consortium of PT Rekayasa Industri and Rafako S.A.
Owner: PT PLN (Persero) - UIP Nusatenggara
Inspector represent: PLN (Persero) - Pusmanpro
Inspection site: ABB Oy - Helsinki Area, Finland
Inspection date: 08-Jan-2020
-------------------------

 FAT for Boiler Feedwater Pump - Mechanical [Pascal Mertins]
Project name: Lombok CFSPP FTP-2 (2x50 MW)
Contractor: Consortium of PT Rekayasa Industri and Rafako S.A.
Owner: PT PLN (Persero)
Inspector represent: PLN (Persero) – Pusmanpro
Equipment of Inspection: Boiler Feedwater Pump – Fluid Coupling – Performance Test (FAT)
Inspection site: J.M. Voith SE & Co. KG I VTA, Voithstrabe 1, 74564 Crailsheim, Germany.
Inspection date: Dec 17, 2019
---------------------------------
 FAT for Switchgears and PLC Panels - Electrical
Project name: Lombok CFSPP FTP-2 (2x50 MW) Power Plant
Contractor: Consortium of PT Rekayasa Industri and Rafako S.A.
Owner: PT PLN (Persero) - UIP Nusatenggara
Inspector represent: PLN (Persero) - Pusmanpro
Inspection site: ELMIKO [Rybnicka Street 20, 43-190 Mikolow, Poland]
Inspection date: 16-Dec-2019
Products: Switchgears and PLC Panels
------------------------------------------------
 Project Name: Pengadaan Material Transmisi Utama Tahun 2018
Contractor: PT. ABB Sakti Industri
Owner: PLN (Persero) - UIP Sumbagut
Inspector represent: PLN (Persero) - Pusmanpro
Inspection Date: 12 Dec 2019
Inspection Site: ABB Ludvika
Subject of Inspection:  Ligthning Arrester 150 kV model LA150
---------------------------------

 Project name: Lombok CFSPP FTP-2 (2x50 MW) Power Plant
Contractor: Consortium of PT Rekayasa Industri and Rafako S.A.
Owner: PT PLN (Persero) - UIP Nusatenggara
Inspector represent: PLN (Persero) - Pusmanpro
Inspection site: Siemens AG Werner-von-Siemens-Str. 1, Erfurt - Germany
Inspection date: 6, 9 and 11 Dec 2019
Product: Turbine Generator - Electrical FAT
*********************************************************
 Project Name: Pembangunan SUTT 150 kV Sandai - Sukadana Section 1
Owner: PT PLN (Persero),  UIP Kalbagbar
Inspector represent: PT PLN - Pusmanpro
Contractor: PT. Intan Mufakat Raya
Vendor: PT. Avindo Global Pratama
Inspection Site: RIBE Power Malaysia Sdn. Bhd, Selangor, Malaysia
Inspection Date: 21 Nov 2019
====================================

► SISUB FAT - 2019 11 12 Italy, Venice - DS500 S2DAT 550 - Grid Solution SpA
Project Name: Pengadaan Material Transmisi Utama tahun 2018
Contractor: PT Unelec Indonesia (UNINDUO)
Vendor: Grid Solution S.p.A.
Owner: PT PLN (Persero)
Inspector represent: PT PLN (Persero) Pusat Manajemen Proyek (Pusmanpro)
Inspection Location: Grid Solution S.p.A., Via Meucci 22 - 30020 Noventa di Piave (Venice), Italy
----------------------------------------

► Mech Inspection for FAT of Deaerator - Hydrotest
Project:  Lombok CFSPP FTP 2 (2x50MW) Power Plant 
Contractor: Consortium of PT Rekayasa Industri and Rafako S.A.
Owner: PT PLN (Persero) - UIP Nusatenggara 
Inspector represent: PLN (Persero) - Pusmanpro
Location: Stork Thermeq BV in Hengelo, Enschede Area,  Netherland
Inspection Date: 07-Nov-2019, 10-Dec-2019

====================================================================
Other FAT Inspections:

Project Name: Pembangunan Gardu Induk Tegangan Ekstra Tinggi 500 kV Peranap
Contractor: KSO PT ABB Sakti Industri - PT. Waskita Karya (Persero) Tbk.
Owner: PT. PLN (Persero) - UIP SUMBAGTENG
Inspector represent: PT. PLN (Persero) - Pusmanpro
Inspection Type: FAT witness.
Inspection Subject: Disc Insulator
Inspection Date: 5 Nov 2019
Inspection Site: Sediver SpA, Nusco, Avellino Area, Italy
------------------------------------
Project Name: Pengadaan Material Transmisi Utama Tahun 2018
Peruntukan UIP Sumbagut, GI Binjai, GI Perdagangan, GI Perbaungan, GI Kualanamu
Contractor: PT. ABB Sakti Industri
Owner: PLN (Persero) - UIP Sumbagut
Inspector represent: PLN (Persero) - Pusmanpro
Inspection Date: 30 Oct. 2019
Inspection Site: ABB Ludvika,
Subject of Inspection:  Lightning Arrester (LA) 150 kV, type LA 150
--------------------------
Project Name: Pengadaan Material Transmisi Utama Tahun 2018 
Peruntukan UIT JBTB
Contractor: PT. ABB Sakti Industri
Owner: PLN (Persero) - UIP Sumbagut
Inspector represent: PLN (Persero) - Pusmanpro
Inspection Date: 31 Oct. 2019,Inspection Site: ABB Ludvika,
Subject of Inspection:  Lightning Arrester (LA) 500 kV, type LA 500
--------------------------
Project Name: Material Transmisi Utama Tahun 2018
Peruntukan UIT JBT - GITET Pedan
Contractor: PT. ABB Sakti Industri
Owner: PLN (Persero) - UIP Sumbagut
Inspector represent: PLN (Persero) - Pusmanpro
Inspection Date: 5 Nov. 2019,Inspection Site: ABB Ludvika,
Subject of Inspection: Ligthning Arrester (LA) 500 kV, type LA 500
------------------------------
Project Name: Material Transmisi Utama Tahun 2018
Peruntukan UIT JBT - GITET Pedan
Contractor: PT. ABB Sakti Industri
Owner: PLN (Persero) - UIP Sumbagut
Inspector represent: PLN (Persero) - Pusmanpro
Inspection Date: 13, 26 Nov. 2019,Inspection Site: ABB Ludvika,
Subject of Inspection: Current Voltage Transformer (CVT) 500 kV, type CVT 500
------------------------------------------
Oct 24-29, 2019, FAT for Siemens Steam Turbine Generator/Exciter
Project:  Lombok CFSPP FTP 2 (2x50MW) Power Plant 
Inspection Location: Siemens AS, Erfurt Area, Germany
-------------------------------------------

► Request: Elect Inspector for FAT Gas Turbine Generator Package at ABB AB, Machines, Elmotorgatan 2, Building 394, Finslatteen, SE-721670 Vasteras, Sweden
Inspection Period: TBD
 Nov, 2019, Total 5 days (3 days Typical Test + 2 Routine Test)
Work Scope:

  •     Testing of MCP/GCP, Main Terminal Box or other equipment;
  •     Visual Inspections, if the machine is available;
  •     Guided Factory Tour;
  •     Documentation Review.

The Candidate shall be fully trained and have a minimum of 10 years experiences in inspection of electrical and instrumentation materials and Gas Turbine Generator Package equipment test such as switchgear, motor control and other equipment used at onshore and offshore facilities for Oil and Gas or Petrochemical industries.
-------------------------------------------

If you are available and interested in this short term Inspection, Please send your CV.doc(per CV Format) and Certs[Competence/Education/Training Certs] to me ASAP! and Tell me your requested Day Rate (USD/Man-Day, All-inclusive Price including Reporting, Travel and Accommodation Cost).

Welcome to recommend people around Inspection Location to me! Retired People will be OK.

--
Mac LU
TPI Coordinator | Europe, China, Malaysia
OMIC-IDEAS Consortium: OMIC (PT. OMIC Consulting Services Indonesia) | 
Huizhou IDEAS Technical Consultants & Services Co., Ltd.
E: 13715397007@126.com; inspection@epchr.com; Cell Phone: +86 137 1539 7007
Website: http://www.epchr.com/2010/jobs_view.aspx?id=344
WeChat: 44604470 [download: https://www.wechat.com/en], Skype ID: epchrmac
Mac于2020-6-1 20:22:23最后一次编辑本内容

©  版权所有:惠州艾迪斯技术咨询服务有限公司             粤ICP备09168046号
地址:广东省惠州市惠城区河南岸10号社区南山花园1-8A,516007 电话:0752-2050066
技术支持:惠州艾迪斯技术咨询服务有限公司 -  EPCHR@126.com