Solar thermal power plant (建设工期18个月)
Project location information: Anduo County, Tibet Autonomous Region, China.
西藏安多县太阳能光热发电厂项目在土建/设备安装及调试阶段需要项目现场经理,土建/机械/电气工程师以及文控职员。
Project Overview
According to the project schedule, after the official commencement of site work, the design supervision plans to deploy on-site service personnel in three phases, namely:
(1) Civil Construction Phase.
(2) Equipment Installation Phase.
(3) Commissioning Phase. Each phase shall ensure 5 on-site service personnel. Personnel replacement and leave require the permission of the Employer. Personnel shall take vacations in accordance with national statutory holidays.
Civil Construction Phase:
1. 1 Project Site Executive Manager.
2. 2 Civil Engineering Professionals.
3. 1 Geological Professional.
4. 1 Data Clerk.
Equipment Installation Phase:
1. 1 Project Site Executive Manager.
2. 2 Mechanical Engineering Professionals.
3. 1 Electrical Engineering Professional.
4. 1 Data Clerk.
Commissioning Phase:
1. 1 Project Site Executive Manager.
2. 1 Systems Professional.
3. 1 Thermal Control Professional.
4. 1 Electrical engineering professional.
5. 1 Data Clerk.
Requirements for On-Site Project Manager:
• At least 10 years of work experience.
• Proven project management experience.
• Work experience in solar thermal power plants or a solid understanding of solar thermal power plant operations.
• The On-Site Service Executive Manager is required to have on-site construction management experience, be responsible for coordination and communication with the Employer and the EPC unit and assist the Employer in completing work tasks. Responsibilities include preparing meeting minutes for meetings organized by the Employer, and compiling design supervision weekly and monthly reports.
****************
Electrical, Civil Engineering, Mechanical Engineering Professionals and Data Clerk (4 persons in total), requirements are as follows:
• Approximately 3-5 years of work experience.
• Relevant experience in thermal power or solar thermal power plants
Data Clerk Requirements Requirement:
1. Designate a person in charge of supervision archives, who shall participate in archive work briefings or training organized by the Client.
2. Supervise the archive work of the design unit within the scope of supervision and urge the design unit to timely submit design archive materials as required by the Employer's archive management department.
3. Review documents delivered by designers within the scope of supervision to ensure the completeness of handover documents from participating units, compliance of document quality with the Client's Archive Management Measures, and correct organization.
4. Before the design completion acceptance, transfer documents reflecting supervision activities to the Client.
有感兴趣的可以联系我: Mike LU (WeChat: 44604470, epchr@126.com)