易聘管理咨询(亚洲)有限公司

首页 > Factory Assessment in Chengdu工厂评估-成都

Factory Assessment in Chengdu工厂评估-成都
发布日期:2024年02月19日 猎头顾问:roney 点击数:66
直接投递您的简历(*.doc,*.pdf):
输入验证码: 点击可刷新验证码 刷新!
此处上传的简历遵从网站《保密协议》。简历仅提供给本职位HR负责人筛选用!

Factory Assessment pertaining to the Drilling Rig Simulator

Vendor Name: Chengdu Esimtech Petroleum Equipment Simulation Technology Co., Ltd.
Address: No.88 (Binfen Time Square) Xingle North Road, Xindu District, Chengdu, Sichuan, China
Website: www.esimtech.com

Here is a draft scope of work to assess a company's capability to supply a Drilling Rig Simulator based on the requirements:

Scope

The assessment will evaluate the company's technical capability, infrastructure, and processes to develop and deliver a Drilling Rig Simulator (software and hardware consoles) meeting the specifications outlined in Attachments.

Assessment Areas

1) Technical Capability Assessment

- Review design experience with drill rig software modeling
- Assess knowledge of drilling operations and equipment
- Evaluate prior simulation projects and complexity.
- Check software development methods and tools.
- Assess experience integrating third-party systems.

2) Infrastructure Assessment.

- Verify hardware/software infrastructure.
- Check availability of qualified engineers across disciplines.
- Ensure access to latest modeling, simulation technology.
- Confirm capabilities for console design and development.

3) Quality and Process Assessment.

- Review product engineering processes.
- Check software development, testing processes.
- Examine configuration management, version control.
- Verify quality management system.
- Assess process compliance to ISO standards.

4) Project Delivery Assessment

- Evaluate capacity for expected project scope.
- Review previous timelines vs. commitments.
- Check ability to deliver global installations.
- Assess maintenance and customer support capability.

5) Compliance Check

- Detail-by-detail compliance check of Attachment 1 specs
- Identify any gaps or shortcomings.
- Agree on resolution for non-compliant aspects.

Deliverables

The assessment report will summarize findings on infrastructure, technical capabilities, and processes. It will provide detailed compliance mapping to the simulator specifications. Expected project timelines will be included based on findings.

Contact: 13715397007@126.com

roney于2024-2-19 11:33:08最后一次编辑本内容

©  版权所有:惠州艾迪斯技术咨询服务有限公司             粤ICP备09168046号
地址:广东省惠州市惠城区河南岸10号社区南山花园1-8A,516007 电话:0752-2050066
技术支持:惠州艾迪斯技术咨询服务有限公司 -  EPCHR@126.com